ESPR Delegated Acts: A Governance Guide to the Procedure - and How to Shape It

Most companies tracking ESPR are watching the wrong document. The regulation itself - Regulation (EU) 2024/1781, which entered into force on 18 July 2024 - contains almost no product-specific requirements. The numbers that will actually govern your products: the durability thresholds, the recycled-content minimums, the Digital Product Passport data fields, the compliance deadlines. Those live in delegated acts that the European Commission adopts product group by product group.
That means the real regulatory action is not in the Official Journal entry for ESPR. It's in a pipeline of preparatory studies, expert consultations, and draft texts that runs for years before a delegated act is published. And the companies that understand that pipeline - and engage in it early - are the ones that shape what the final requirements look like.
This post maps the exact stages, the concrete windows for stakeholder input, and the strategic logic of when and how to engage.
Why Delegated Acts Are Where ESPR Gets Real
ESPR is deliberately a framework regulation. It creates the legal basis, the governance structures, and the overarching principles. The detail - the enforceable rules - lives in the delegated acts, which the Commission can adopt without going back through the full legislative process. Once a delegated act enters into force, it has direct legal effect across all 27 Member States with no additional national transposition required.
The first ESPR Working Plan (COM(2025) 187), adopted on 16 April 2025, covers the period 2025-2030 and identifies approximately 19 priority product groups for delegated act development. The six new product groups at the front of the queue are textiles, furniture, mattresses, tyres, iron and steel, and aluminium. Iron and steel carries an indicative adoption date of 2026; textiles, tyres, and aluminium are targeted for 2027.
But those dates are the finish line. The process that produces them starts years earlier - and that's where your leverage is.
The Six-Stage Pipeline
A delegated act under ESPR typically takes three to five years from the start of the preparatory study to entry into force. Understanding each stage - and what happens in it - is the foundation of any effective engagement strategy.
Stage 1: The Working Plan - Your Earliest Warning Signal
The Working Plan is the Commission's programme for delegated act development. It identifies which product groups will be addressed, the indicative timeline for each act, and the priority order. It is adopted by the Commission after consultation with the Ecodesign Forum.
The first ESPR and Energy Labelling Working Plan was adopted on 16 April 2025 with a five-year horizon and a mid-term review scheduled for 2028. That 2028 review is a second meaningful entry point: the Commission will use it to reassess priorities and potentially add product groups - including footwear, paints, detergents, lubricants, and chemical products - that are currently under exploratory study.
What to do at this stage: Monitor EUR-Lex and the Commission's ESPR webpage for Working Plan updates. If your product category is not yet listed, the 2028 review is the next realistic window for inclusion. If it is listed, the clock on the preparatory study has already started - or will soon.
Stage 2: The Preparatory Study - Where Requirements Are Actually Shaped
This is the most important stage for stakeholder influence, and the one most companies miss.
The preparatory study is an independent technical analysis commissioned by the Commission and largely coordinated by the Joint Research Centre (JRC). It assesses the environmental impact of the product group, the technical feasibility of potential ecodesign requirements, and the economic effects on manufacturers and the supply chain. Preparatory studies typically take 18 to 24 months to complete.
The study is not a closed process. During the preparatory study, stakeholders - including manufacturers, industry associations, consumer organisations, environmental NGOs, and Member State representatives - are consulted through workshops, online consultations, and bilateral meetings. The JRC follows what is known as the "Sevilla process": milestone documents are published, registered stakeholders receive email notification, online consultation meetings are held, and written comments are collected and published (anonymised) on the product bureau website.
The textiles preparatory study illustrates how this works in practice. The JRC's textiles preparatory study reached its third milestone in December 2025, with registered stakeholders invited to attend online consultation meetings in January 2026 and submit written comments through to late March 2026. Confidential supporting documents could be submitted directly to the JRC team by email.
Why this stage matters most: The preparatory study is where the Commission's technical understanding of your product group is formed. The data you submit here - on manufacturing constraints, material substitution costs, repairability trade-offs, supply chain realities - directly informs the impact assessment that underpins the draft delegated act. Once the draft is written, the architecture of the requirements is largely fixed. Commenting on a near-final draft is advocacy; engaging during the preparatory study is co-authorship.
Register as a stakeholder on the JRC Product Bureau website for your product category as early as possible. Registration is open to any organisation or individual and is free. Registered stakeholders receive email notifications of milestone documents and consultation meetings — without registration, you will miss the windows entirely. Find the product bureau at susproc.jrc.ec.europa.eu/product-bureau.
Stage 3: The Ecodesign Forum - The Institutional Consultation Body
The Ecodesign Forum is ESPR's permanent multi-stakeholder advisory body. With almost 130 members, the Forum brings together Member States, industry, NGOs, and academia to ensure transparent and participatory implementation of the ESPR. Members include manufacturers, industry associations, consumer organisations, environmental NGOs, trade unions, retailers, importers, and researchers.
The first meeting of the Ecodesign Forum took place on 19-20 February 2025 in Brussels, where it discussed priorities and study plans. The Forum advises the Commission on the Working Plan and reviews draft delegated acts before they proceed to public consultation.
The Forum is not a rubber stamp. The Commission is mandated to take the Forum's views into account when developing ecodesign requirements. Forum membership is competitive - organisations apply and are selected based on experience, representativeness, and expertise - but the meetings are documented and the discussion papers are public.
What to do: If your sector association has Forum representation, engage them actively. If not, monitor Forum meeting documents and discussion papers, which are published on the Commission's Green Forum portal. These documents reveal the Commission's current thinking on methodology and product scope before draft texts are circulated.
Stage 4: The Have Your Say Consultation - Open But Late
Once the Commission has drafted the delegated act, it publishes it on the "Have Your Say" portal for public feedback. As part of the Commission's better regulation agenda, citizens and other stakeholders can provide feedback on the draft text of a delegated act during a four-week period.
This window is genuinely open: any company, association, NGO, or individual can submit comments, regardless of whether they participated in earlier stages. The Commission reads and considers the feedback before finalising the act.
The strategic limitation is timing. By the time a draft reaches Have Your Say, the core requirements - the performance thresholds, the DPP data fields, the scope of the product group - are already set. Feedback at this stage can influence implementation details, transition periods, and definitional boundaries, but it is unlikely to change the fundamental architecture of the requirements.
That said, Have Your Say is not worthless. It is the right channel for:
- Flagging implementation ambiguities that could create compliance uncertainty
- Raising concerns about scope definitions that inadvertently capture unintended products
- Submitting evidence on transition period adequacy
- Coordinating with industry peers to amplify consistent messages
Tracking tip: Set up alerts on the Have Your Say portal filtered by "ecodesign" or your product category. The Commission also publishes roadmaps and inception impact assessments on the portal before the full consultation opens - these are worth monitoring as early signals of the draft's direction.
Stage 5: Parliamentary and Council Scrutiny - The Final Gate
After the Commission adopts the delegated act, it is submitted to the European Parliament and the Council. The Parliament and Council have a scrutiny period of two months (extendable to four months) to object to the delegated act; if neither institution raises an objection, the act is published in the Official Journal and enters into force.
The Parliament can object via a vote by a majority of its component members; the Council can object via a qualified majority decision. Importantly, neither institution can amend the act - they can only accept or reject it. In practice, objections are rare but not unprecedented.
This stage is primarily relevant for public affairs teams with direct relationships with MEPs or Council working party members. If a delegated act contains requirements that are technically unworkable or disproportionate, the scrutiny period is the last formal opportunity to trigger a reconsideration - but it requires political mobilisation, not just technical evidence.
The Influence Curve: Why Early Engagement Wins
The relationship between engagement timing and influence is not linear - it is sharply asymmetric.
The gap between when companies typically engage and when engagement is most effective is the central strategic problem in ESPR compliance. Most regulatory affairs teams activate when a draft delegated act appears - at which point the Commission's technical understanding of the product group has already been formed by 18-24 months of preparatory study work, often without meaningful industry input.
In practice, the most effective way to influence requirements is to participate in the preparatory study process before the delegated act is drafted. That means registering as a JRC stakeholder, attending milestone workshops, submitting written evidence on technical feasibility and economic impact, and - where possible - providing proprietary data under confidentiality agreements.
How to Track the Pipeline: A Practical Checklist
The ESPR delegated act pipeline is spread across several official sources. Here is where to look:
| Source | What You Find There | Update Frequency |
|---|---|---|
| EUR-Lex (ESPR Working Plan) | Official adopted Working Plan text and indicative timelines | Updated with each new Working Plan (every 3–5 years) |
| JRC Product Bureau (susproc.jrc.ec.europa.eu) | Preparatory study milestone documents, stakeholder registration, consultation schedules | Ongoing — updated at each study milestone |
| Commission Have Your Say portal | Draft delegated acts open for public feedback; roadmaps and inception impact assessments | Continuous — set up keyword alerts |
| Commission Green Forum portal | Ecodesign Forum meeting agendas, discussion papers, and minutes | Per Forum meeting (typically 2–4 times per year) |
| EUR-Lex (Official Journal) | Adopted delegated acts and implementing acts | As adopted |
Member State Channels: The Underused Route
One engagement channel that many companies overlook is the national route. Member State representatives sit on both the Ecodesign Forum and the Member States Expert Group (Article 20 of ESPR). National ministries - typically environment or economy ministries - feed positions into Commission deliberations throughout the preparatory study and draft delegated act stages.
Engaging your national competent authority early - providing technical evidence, flagging feasibility concerns, or proposing alternative approaches - can amplify your position through an institutional channel that carries significant weight in Brussels. This is particularly effective for SMEs and mid-sized manufacturers who lack the resources to maintain a Brussels presence but have deep technical expertise in their product category.
What Good Early Engagement Looks Like
Effective preparatory study engagement is not lobbying in the pejorative sense. The Commission and JRC are genuinely seeking technical data they cannot generate themselves: real-world manufacturing cost curves, material substitution constraints, supply chain lead times, repairability trade-off data. Companies that provide this evidence in structured, verifiable form are providing a public good - and shaping the requirements that will govern their market.
Concretely, this means:
- Registering as a JRC stakeholder for your product category as soon as a preparatory study is announced
- Attending milestone workshops and submitting written comments at each consultation round
- Providing quantified evidence - not qualitative assertions - on technical feasibility and economic impact
- Coordinating with sector associations to ensure consistent, evidence-based positions across the industry
- Monitoring the Ecodesign Forum discussion papers for signals about the Commission's evolving methodology
- Engaging your national ministry to ensure Member State representatives understand your sector's position
The Bottom Line
ESPR delegated acts are not events that happen to companies. They are processes that companies can participate in - if they know where to look and when to act.
The pipeline from Working Plan inclusion to entry into force typically spans three to five years. The window where stakeholder input most directly shapes the outcome - the preparatory study - runs for 18 to 24 months in the middle of that period. Companies that engage during the study are co-authors of the technical evidence base. Companies that engage only at Have Your Say are commenting on a near-finished text.
The ESPR Working Plan 2025-2030 identifies approximately 19 priority product groups, with the Commission aiming to adopt the first wave of delegated acts between 2026 and 2028. For the product groups already in preparatory study - textiles, tyres, iron and steel, appliances, electric motors, and electronic displays - the most influential engagement windows are open now or will open in the near term.
The question is not whether your product category will eventually be covered by a delegated act. It is whether your organisation will have shaped what that act says before it is written.
Related reading

ESPR Carbon Footprint: How PCF Data Actually Enters the Digital Product Passport
ESPR requires carbon footprint disclosure in the Digital Product Passport - but the methodology, data quality, and verification rules are more demanding than most teams expect. Here's what defensible PCF data actually requires.

ESPR and Furniture: Your Practical Roadmap to 2028 and Beyond
Furniture is a named priority in the ESPR Working Plan, with an indicative 2028 delegated-act date. Here's what's fixed, what's indicative, and what to do right now.